分类: 工程与技术科学 >> 工程物理学 分类: 核科学技术 >> 粒子加速器 提交时间: 2023-12-13
摘要: The China Spallation Neutron Source (CSNS) upgrade project (CSNS-II) aims to enhance the beam power from 100 to 500 kW. A dual-harmonic accelerating method has been adopted to alleviate the stronger space-charge effect in rapid-cycling synchrotrons owing to the increased beam intensity. To satisfy the requirements of dual-harmonic acceleration, a new radiofrequency (RF) system based on a magnetic alloy-loaded cavity is proposed . This paper presents design considerations and experimental results regarding the performance evaluation of the proposed RF system through high-power tests and beam commissioning. The test results demonstrate that the RF system satisfies the desired specifications and affords significant benefits for CSNS-II .